Close

Rankine compression gas turbine (RCG)

  • Variable electrical output <2sec (!)
  • Uninterrupted steam supply
  • Payback time <3 years (without subsidy!)

Once through steam boiler (OTB)

  • Start-up from cold within minutes
  • Saturated or superheated steam from temperatures >200 degC
  • Controlled evaporation als enables desalination or water separation

Prototyping & Consultancy

Multi disciplinary team:

  • Energy technology
  • Process technology
  • Mechatronics
  • Data acquisition
  • Consultancy